Why Bagration Bridge Opened Before Tower 2000

Bagration Bridge opened in 1997, while Tower 2000 on the river’s right bank came into service four years later. This head start did not compromise architect Boris Tkhor’s overall vision: the crossing established a pedestrian axis from the site of the future Moscow City business district to the high-rise on the right bank.

The chronology can be reconstructed from a publication on the city’s history, information about the development and a 2005 article in Kommersant. The bridge’s opening was timed to mark Moscow’s 850th anniversary; the newspaper describes a halt in funding for the tower and changes in the parties involved. The available sources do not allow the entire four-year interval to be attributed to a single cause.

The covered walkway of Bagration Bridge, with a row of glass-fronted shops and a moving walkway.

Shop windows and a moving walkway inside Bagration Bridge. Moscow, May 2001. Wikimedia Commons, Bagration Bridge shop views May 2001.jpg, author: Igor Mikhalev, licence: CC BY 4.0 source, license

What stood on the riverbanks before the bridge and tower?

Before the bridge was built, the World Trade Centre and an exhibition complex already stood on the left bank of the Moskva River, while Tower 2000 had yet to appear on the right bank beside Taras Shevchenko Embankment. The Department of Cultural Heritage’s magazine, Moscow Heritage, traces the industrial past of this stretch of riverbank up to the 1970s and the subsequent arrival of major public buildings. The publication dates the start of construction of the business district to 1995 and gives 1997 as the year of the crossing.

The right bank beside Taras Shevchenko Embankment formed the other side of this composition. This was where Tower 2000 was built. The familiar image of Moscow City as a cluster of high-rises on one bank therefore overlooks an important part of the original project: the early vision encompassed both sides of the river. The bridge linked the business centre site to the office building on the right bank.

Why the embankment matters when dating the project

Moscow Heritage presents the history of Krasnopresnenskaya Embankment as a succession of different urban uses. A road along a reinforced riverbank appeared here in the late 18th century. In 1799, Vasily Prokhorov founded a calico-printing factory nearby. In 1935–1936, the embankment was faced with granite and surfaced with asphalt. These were three distinct stages in the area’s development before the arrival of the new business district.

In the 1970s, the World Trade Centre and an exhibition complex were built beside the former industrial area. In 1991, Boris Tkhor proposed locating a new business district near Expocentre, alongside the public venues already in operation.

The Department of Cultural Heritage’s magazine also describes Krasnaya Presnya Park, on the site of the Studenets estate, which retains parts of the old layout and its ponds. This neighbouring layer of history does not make the bridge part of the estate, but it helps reveal the diversity of the riverside setting before Moscow City was built: parkland, exhibition grounds, factory buildings and Dorogomilovo on the opposite bank.

Several anglers holding fishing rods stand at the edge of a pond in a black-and-white photograph.

Anglers beside a pond in Krasnaya Presnya Park in Moscow, June 1966. Wikimedia Commons, Fishing on Krasnaya Presnya Park.jpg, author: Moscow Main Archive Administration, licence: CC BY 4.0 source, license

It was in this setting that the pedestrian crossing acquired its significance for urban planning. It linked the future business centre to the tower site on the right bank across a river that already separated established urban areas. This is an inference drawn from the locations of the structures and the published chronology, rather than a claim that all the surrounding neighbourhoods were conceived as part of a single plan by Tkhor.

How did Boris Tkhor bring the bridge and Tower 2000 together in a single project?

The connection was inherent in their shared authorship and locations. The Archi.ru catalogue of architectural projects presents ‘Tower 2000 and Bagration Bridge’ in a single entry and lists Boris Tkhor and Larisa Kunitsyna among the design team. The same page gives the high-rise’s address as 22 Kutuzovsky Prospekt; this location on the right bank helps establish its position in relation to the bridge’s alignment on a map. This is evidence of a unified vision; it does not mean that both structures came into service on the same day.

Tkhor proposed locating the new business district beside Expocentre as early as 1991. An article in Moskovskaya Perspektiva about Boris Tkhor gives his explanation for choosing the site: a modern high-rise centre could be built away from the historic core without replacing older buildings to make way for it. The publication recounts the testimony of structural engineer Vladimir Travush, who helped create the crossing and links its design directly to Tkhor.

The business centre site lay on the left bank; the bridge led across the Moskva River to Tower 2000 on the right bank. The crossing provided a physical connection between these points, while the high-rise made the project’s right-bank endpoint prominent in the skyline. Together, the two structures extended the planned district beyond a single site.

The covered Bagration Bridge stretches towards the rounded Tower 2000 against an orange sky.

Bagration Bridge approaching Tower 2000. Moscow, April 2005. Wikimedia Commons, Bagration Bridge April 2005.jpg, author: Ruslan Krivobok, licence: CC BY 4.0 source, license

The Archi.ru entry documents the bridge and tower project created by Tkhor and his colleagues. Moscow City’s later skyscrapers were designed by other teams, so this early pair should be considered in the context of its own period.

Structural engineer Vladimir Travush, in a published interview with Maria Elkina, recalls joining the project at Tkhor’s invitation in 1992. He also explicitly identifies the bridge as the first structure built, followed by Tower 2000. This participant’s account is useful for checking the sequence, although recollections of details decades later need to be compared with documents. For example, Travush mentions 36 storeys in the interview, while the current entry from CITY PJSC gives 34. The number of storeys is not a basis for dating here; it is more reliable to use the sequence of construction on which the sources agree.

What the original plan for the business district envisaged

The original plan for the business district extended beyond the bridge and Tower 2000. At a round-table discussion at the Museum of Moscow, Sergei Tkachenko, former head of the Moscow Master Plan Institute, explained that the area was divided into individual plots, with a park envisaged at its centre above underground transport and parking infrastructure. RBC Real Estate also describes the arrangement of high-rises around a green public space. The bridge and the tower on the right bank became the first completed part of the larger plan.

The same article records how the overall concept changed as different investors became involved. They designed buildings for their own plots, and the original plan for a unified high-rise ensemble gradually evolved. This is no reason to declare the later towers an architectural mistake: they had their own designers, objectives and schedules. The first completed pair helps distinguish the architect’s original vision from the district’s present-day appearance.

In Tkhor’s own recollections, published by Moskovskaya Perspektiva, the riverside location offered a way to place the new high-rise centre outside Moscow’s historic core. It is important to treat this source as the architect’s explanation: it tells us how he justified his vision, but does not in itself confirm that every subsequent construction decision followed the original brief.

The road along Krasnopresnenskaya Embankment, with the Expocentre building on the right and the towers of Moscow City ahead.

Expocentre on Krasnopresnenskaya Embankment and the towers of Moscow City. Photograph taken in 2016. Wikimedia Commons, Moscow, Krasnopresnenskaya Embankment, Expocenter (30920282251).jpg, author: Gennady Grachev from Moscow, Russia, licence: CC BY 2.0 source, license

Why did the bridge open before Tower 2000 was completed?

Bagration Bridge opened to mark Moscow’s 850th anniversary in 1997. The Reforma Foundation, which was funding Tower 2000, stopped investing that same year, after which the city purchased the development rights and signed agreements with several investors. This sequence is reported by Kommersant in an article dated 24 March 2005. An industry review and the CITY PJSC entry. The sources explain the gap between the two dates, but do not establish how many months of the delay were attributable to the halt in funding.

Kommersant identifies the first investor as the Reforma Foundation, headed by economist Stanislav Shatalin. Funding for the high-rise ceased after his death in 1997. This is a retrospective newspaper account published eight years later; the materials reviewed contain no report from the foundation that would establish the amount invested or the precise length of the interruption. The conclusion that can be drawn reliably is narrower: the bridge and tower shared an early design, but funding for the building had to be reorganised after the crossing opened.

What is known about the change of investors

According to Kommersant, the city purchased the development rights for Tower 2000 from the Reforma Foundation and agreed co-investment arrangements with several parties. The bridge had already been completed by then. The river crossing was therefore in use while the office building on the right bank was being completed with a different group of investors. The article provides no timetable for the individual agreements, so it cannot establish the date on which each construction operation resumed.

The 2005 article includes another detail: 14 of the 27 floors counted by the newspaper in its account of ownership were privately owned. For the building as a whole, the CITY PJSC entry and the review in SOK magazine give a figure of 34. These figures describe different aspects of the tower — the distribution of ownership rights and the total number of storeys — but the sources provide no detailed counting methodology. They cannot be used to calculate the proportion of private funding in the construction cost or to explain the length of the delay.

The newspaper states that Miosor LLC managed the building in 2005. This refers to the period after it came into service, rather than to the original investor or contractor. The CITY PJSC entry names Promstroy-tekhnoinvest as the developer. These different company names do not contradict one another: the investor in the initial works, the parties involved in completion, the developer listed in the building’s records and the management company in 2005 fulfilled different roles. This distinction matters when explaining the delay.

The glass-clad Tower 2000 on the left, with the covered Bagration Bridge extending to the right.

Tower 2000 and Bagration Bridge in Moscow, 12 September 2012. Wikimedia Commons, Tower 2000 12th September 2012.jpg, author: BpbAlonka, licence: CC BY-SA 3.0 source, license

The phrase ‘bought the construction rights’ does not mean purchasing a finished property: when the parties involved changed, the office building still needed to be completed. In a 2005 article, Kommersant describes Tower 2000 as already in operation under the management of Miosor LLC. Between these two stages came the acceptance of the first phase in 2001, reported by SOK magazine. The sources distinguish between the transfer of rights, completion of construction and commissioning, but do not date every intermediate construction stage.

CITY PJSC gives 2001 as the year Tower 2000 was commissioned, with a height of 104 metres and 34 storeys. Moskovskaya Perspektiva also dates the completion of the business district’s first office building to 2001. The 2005 newspaper article describes the transfer of construction rights, while the building’s fact sheet records the outcome. Together, they provide a sequence of events without suggesting that the legal transfer in itself meant construction resumed immediately.

Why sources give different dates for the start of construction

Kommersant dates the start of construction on the first two structures to 1996. A near-contemporary review in SOK magazine specifies December 1996 for Tower 2000. However, CITY PJSC’s current catalogue gives 1998 as the year construction of the building began. The publicly available materials do not include documents explaining precisely which operations each source treats as the starting point. The exact start of construction therefore cannot be stated without qualification; the sources agree on completion in 2001.

For the bridge, the discrepancy does not alter the chronology: Stroitelnaya Gazeta and Kommersant date its opening to September 1997, while a publication on the city’s history also gives 1997. For the tower, the sources differ specifically on when work began, but all three accounts of its commissioning—the industry review, CITY PJSC and Moskovskaya Perspektiva—place it in 2001. The boundaries between construction stages are open to discussion, but the order in which the bridge and tower were completed is not.

The discrepancy in dates is particularly important when explaining the delay. Simply subtracting 1996 from 2001 gives five calendar years, but does not prove that construction continued uninterrupted throughout that period. Using the catalogue’s date of 1998 would omit a stage that two other sources date to 1996. The funding history should therefore be presented as a documented sequence: the original fund, the cessation of its investment in 1997 as reported by Kommersant, the city’s purchase of the rights, completion with new participants and commissioning in 2001.

The glass-enclosed Bagration Bridge crosses above the road towards the cylindrical Tower 2000.

Bagration Bridge and Tower 2000 in Moscow, 14 September 2005. Wikimedia Commons, Moscow, Bagration Bridge and Tower 2000.jpg, licence: CC BY-SA 3.0 source, license

What was accepted into service on 7 August 2001

SOK magazine reports that the first phase of Tower 2000 was accepted into service on 7 August 2001. According to the publication, it included the high-rise office section, a business centre, a media centre, public areas, a restaurant, a café and some of the retail space. The phrase ‘first phase accepted into service’ describes a specific phase of the building. It does not mean that the entire planned Moscow-City district, or every space within the high-rise on the right bank, was completed in a single day.

The review from the early 2000s describes a 34-storey building with a total floor area of more than 60,000 square metres. In addition to offices, the complex is described as including underground levels with parking, retail space and service premises. CITY PJSC’s listing also gives 34 storeys, a height of 104 metres and 2001 as the year of commissioning. This gives a picture of the property operating on the right bank in 2001: a multifunctional office building, rather than merely the endpoint of a pedestrian axis on a plan.

The acceptance certificate for the first phase itself is not reproduced in any of the materials consulted. The precise date of 7 August should therefore be attributed to SOK magazine, while the year of commissioning can be treated as confirmed by several sources. Moskovskaya Perspektiva and CITY PJSC both give 2001. The distinction in precision matters here: the specific date comes from a single industry account, while the year is independently corroborated.

SOK also describes the planned relationship between Tower 2000, Bagration Bridge and a five-level restaurant building on Krasnopresnenskaya Embankment. The publication outlines the scheme envisaged in the early 2000s, but does not in itself prove that all its parts were built at that time. Even after the tower’s acceptance, it is necessary to distinguish between the completed building, the operational bridge and the other elements named in the project. This distinction helps avoid presenting 7 August as the date when the original programme was completed in full.

Was it a ‘bridge to nowhere’?

In a 2005 article, Kommersant reports that the bridge acquired this nickname while the tower remained unfinished and the business district had yet to be built up. The phrase conveys contemporary perceptions, rather than an engineering description. In 1997, the crossing already linked two physical riverbanks and served its own pedestrian function. The problem was that the planned focal points at either end of the ensemble were not yet fully operational.

The newspaper’s metaphor recalls the gap between the completed bridge and the construction work lagging behind it. From the design stage, the crossing was intended to link the business district on the left bank with the tower on the right bank. By 2001, this pairing had a completed office building at one end, while development of the rest of Moscow-City continued. Kommersant noted in 2005 that the bridge and Tower 2000 remained the first fully commissioned structures; that assessment refers to the state of the district at the time of publication, rather than the number of buildings standing today.

Broad steps and a paved area in front of a blue glass structure, with a rounded tower rising behind.

A paved area on the approach to Bagration Bridge; Tower 2000 is visible behind the glass structure. Moscow, June 2016. Wikimedia Commons, Moscow-City, yet undeveloped lot in front of Bagration Bridge (31397609265).jpg, author: Gennady Grachev from Moscow, Russia, licence: CC BY 2.0 source, license

Why the date in the name cannot be taken as the opening date

The number ‘2000’ is easily mistaken for the year the building was commissioned. Yet the bridge opened in 1997, while Tower 2000 was commissioned in 2001. The name is not an acceptance date. Archi.ru lists ‘2000’ in its entry for the overall project; CITY PJSC and publications on the city’s history date the high-rise’s entry into service to 2001. An RBC Real Estate review gives 1997 alongside the name. This date conflicts with SOK magazine’s report that the first phase was accepted into service on 7 August 2001 and with official information giving 2001; we use the latter two sources for the chronology.

When comparing publications, it is necessary to distinguish between the project’s designation, a catalogue entry and the year construction was completed. The industry review reports that the first phase was accepted into service on 7 August 2001, but does not reproduce the certificate or establish the date when all work ended. The date ‘2000’ in the Archi.ru catalogue therefore does not contradict the established year of commissioning, while the date given by RBC requires qualification. To answer the central question, what matters is the separate milestones for the bridge and the tower, rather than an attempt to assign a single opening day to every part of a large complex.

The glass entrance to Tower 2000, with columns and central doors; a person walks past on the left.

The entrance to Tower 2000 on the way to Bagration Bridge: the glass façade and central doors. Wikimedia Commons, Moscow, entrance to Bagration Bridge through Tower-2000 building (279).jpg, author: Svetlov Artem, licence: CC BY 3.0 source, license

What exactly did Bagration Bridge connect?

The crossing linked Krasnopresnenskaya Embankment with Taras Shevchenko Embankment. Moskovskoye Naslediye names these locations explicitly. Within Moscow-City, the bridge connected the emerging business district on the left bank with the construction site of Tower 2000 on the right. Its role therefore extended beyond providing a shortcut across the water: it established a route through the original architectural ensemble.

The publication on the city’s history describes Bagration as a shopping and pedestrian bridge. This definition matters: the design envisaged both an engineered crossing and a public space for pedestrians. Its retail function, however, does not alter the central urban planning fact—the bridge physically took people from the main area of the new business district to the tower across the river.

The crossing as it was in 1997 cannot be described through the lens of all Moscow-City’s present-day transport links. Today’s stations, galleries and routes developed in stages. To understand the early project, it is enough to compare the two banks on a map and see where the bridge’s axis leads: from the site of the future district to the high-rise on the right bank. Later transport improvements simply added new ways to use this connection.

How the bridge functioned before the metro arrived

An industry review from the early 2000s shows that Bagration was an early part of Moscow-City’s infrastructure, rather than a decorative gesture preceding construction of the towers. According to SOK magazine, a digital telephone exchange for the future business centre had been installed on the crossing itself by 2002. The same review places the bridge within the first phase of the complex and describes roads linking the Moscow International Business Centre site with the Krasnopresnensky Exhibition Complex and Taras Shevchenko Embankment. The pedestrian crossing and utility networks developed alongside the office buildings.

Inside Bagration Bridge: a long walkway, curved glazing frames and people in the distance.

The pedestrian gallery of Bagration Bridge with its curved glazing, 5 September 2004. Wikimedia Commons, Bagration Bridge September 2004.jpg, author: RIA Novosti / Alexander Polyakov, licence: CC BY 4.0 source, license

This does not mean that the bridge served as a substitute for the metro station that opened later. In 1997, its primary role was to provide a direct pedestrian crossing between the riverbanks; other connections grew around the already completed structure. The publication from the early 2000s records the mini-metro proposals of the time as plans, while the report on the station in 2005 records a later outcome. This sequence explains why a historical account cannot project today’s interchange network back to the opening of Bagration Bridge.

Why the bridge needed two levels

Bagration’s engineering design carried forward the architectural idea of linking the riverbanks. Arkhitekturny Vestnik, in an article on the work of Vladimir Travush, describes the bridge’s upper retail level and lower pedestrian level. The publication also notes its space trusses and a shell with large cut-outs supported at three points. This is no ordinary pavement raised above the river, but a three-dimensional building that serves as a crossing, with its own engineering structure.

The two levels allowed different functions to be accommodated within a single structure: passage for visitors and space to spend time in the covered gallery. This separation explains the historical description ‘shopping and pedestrian bridge’ used in the city magazine. The term describes the actual type of structure, rather than serving as a promotional epithet. The precise arrangement of retail units and access to the premises may have changed over the years; the documented functional layout is sufficient to understand the original concept.

Stroitelnaya Gazeta gives a length of 214 metres and a width of 16 metres, while Kommersant gave the length as 217 metres in 2005. The sources do not explain how the length was measured or whether adjoining sections were included. The exact length therefore cannot be presented as undisputed without qualification. For the main conclusion, the approximate scale is sufficient: the structure crosses the river and links two focal points on its banks; the width of 16 metres confirms the scale of the covered gallery.

In an article in Moskovskaya Perspektiva, the engineer Travush recalls working with Tkhor on the bridge. His account helps connect the architect’s idea with its structural realisation, but remains a participant’s recollection. The description of the truss system in a professional publication provides a second, technical perspective. Together, these sources show that linking the two riverbanks required a distinct spatial structure, rather than merely the silhouette of a glass tube.

The cylindrical Tower 2000 behind the glass-enclosed bridge with diagonal metal supports; cars are visible below.

Tower 2000 and the adjoining Bagration Bridge: diagonal structural elements are visible above the road. Wikimedia Commons, BagrationBridge.structure — panoramio.jpg, author: salech hcelas, licence: CC BY 3.0 source, license

How the bridge’s role in the original project differs from later transport interchanges

When Bagration Bridge opened in 1997, there was not yet a nearby metro station on the Filyovskaya line’s branch to Moscow-City. A Radio Liberty report dated 10 September 2005 records the opening of Delovoy Tsentr station — eight years after the bridge opened. It was subsequently renamed Vystavochnaya, and a government resolution dated 11 June 2024 restored its original name. This is why both names appear in accounts of different periods.

Visitors today often see the bridge as an extension of the metro entrance hall. Historically, the sequence was the reverse: the river crossing came first, and only later did a new station serve the growing business district. This distinction helps avoid anachronism: Tkhor’s decision in the 1990s cannot be explained by the interchange network that had taken shape by the mid-2000s.

In 2005, Kommersant reported on plans to connect the bridge’s lower level to the underground section of the Moscow International Business Centre and a transport interchange. The wording in the article refers to the plan at that time; it does not prove that all the proposed passageways were ready when the crossing opened. This is why the historical account distinguishes the original pedestrian link between the banks from the transport infrastructure that developed around it later.

People outside the entrance to Delovoy Tsentr metro station; high-rise buildings under construction are visible behind the low entrance pavilion.

The entrance to Delovoy Tsentr station, with the towers of Moscow City under construction in the background. Wikimedia Commons, Vestibule of Delovoy tsenter station (Entrance hall of Delovoy Tsentr station) (3528816357).jpg, author: Mikhail (Vokabre) Shcherbakov from Moscow, Russia, licence: CC BY-SA 2.0 source, license

How should we interpret this pair in the city panorama?

CITY PJSC describes Tower 2000 as the complex’s only building on the right bank of the Moskva River; the main cluster of high-rises stands opposite. This arrangement confirms the two-part composition of the original ensemble. The bridge provides the horizontal link, while the 104-metre building, whose height is given by Moskovskaya Perspektiva, marks one end of it. This interpretation follows from the structures’ locations and published material on the original design.

This perspective adds precision to the familiar brief account of the high-rise district’s history — as though it all began with just another skyscraper. Moskovskaya Perspektiva calls the bridge the district’s first completed structure, and Tower 2000 its first office building. Distinguishing these two firsts makes the construction sequence clear: the river crossing came first, followed by the completion of the high-rise to which it led.

A review in SOK magazine describes the overall architectural concept as a combination of Tower 2000, the Bagration shopping and pedestrian bridge, and a five-level restaurant building on Krasnopresnenskaya Embankment. The publication identifies the last element as part of the composition; without separate confirmation that it was built, a description of the scheme cannot be presented as a list of completed structures. Yet the three-part arrangement itself shows that the designers conceived the bridge as a passage linking different functions on the two banks. The early pair thus amounted to more than a single tower with a convenient crossing: it set the direction for the development of the entire site.

What remains of the original architectural idea

As later high-rises transformed the skyline of the left bank, the bridge and Tower 2000 remained a recognisable pair from the initial phase. RBC Real Estate published an early concept by Tkhor’s studio and an account of a discussion of the project at the Museum of Moscow: a coordinated group of buildings was envisaged around an internal green space, but subsequent development followed new decisions by investors and architects. The phrase ‘the business district’s first ensemble’ therefore refers to the pair of structures that were built, rather than the present-day district as a whole.

At 104 metres tall, according to CITY PJSC, Tower 2000 looks modest beside the later skyscrapers. In the early 1990s, its intended role was different: to mark an office extension of the project on the right bank, linked to the main site by a pedestrian bridge. This interpretation follows from the building’s location, its construction date and the catalogue of the architect’s work as a whole.

A cylindrical glass tower beside the river, with part of the covered bridge visible on the left and the embankment in the foreground.

Tower 2000 on the bank of the Moskva River, with Bagration Bridge to the left. Photograph taken in 2018. Wikimedia Commons, A view of Moskva River, Tower 2000 and Bagration Bridge on 2018 April 5 (2396).jpg, author: Alexey V. Kurochkin, licence: CC BY-SA 4.0 source, license

Comparing the old concept with today’s panorama requires care. A single photograph cannot establish which of the later buildings was intended to occupy a particular position in the 1991 version: the plan changed repeatedly. It is more reliable to focus on the verified features of the first pair as built — the bridge, Tower 2000’s position on the right bank, their shared architectural design and their different opening dates.

Can you walk across the bridge now?

As of 25 October 2026, you should not count on being able to cross the bridge. the Unified Transport Portal of Moscow announced on 8 May 2025 that Bagration pedestrian bridge would be closed for reconstruction from 12 May 2025 to 31 December 2030. Check for new official announcements before travelling: the works schedule may change.

The closure also matters when reading older material. Publications from previous years, including some pages on the transport portal, describe crossing the bridge and reaching the piers as an available route. These descriptions relate to periods before reconstruction and do not supersede the later announcement of 8 May 2025. Readers should therefore distinguish previous access arrangements from the restrictions in force on the date of this article.

Following the closure, the transport portal listed the Filyovskaya line, the Moscow Central Circle, Moscow Central Diameters line D4 and the first scheduled electric riverboat route as options for travelling between the banks. These are alternative options given in a 2025 announcement, rather than a timetable valid for any future date. This article concerns architectural history and therefore does not offer a fixed alternative route: current transport arrangements need to be checked separately before travelling.

The closure does not prevent an appreciation of the historical concept from outside: the bridge and tower remain a clearly recognisable pair in the panorama of the two banks. However, you cannot plan a walking route across the bridge itself. Reconstruction is the structure’s present-day condition, separate from the question of the construction sequence in the late 1990s.

A boat on the snow-covered Moskva River, with Bagration Bridge behind it, Tower 2000 on the left and the skyscrapers of Moscow City on the right.

Bagration Bridge over the snow-covered Moskva River, with Tower 2000 at the left edge of the frame, February 2026. Wikimedia Commons, Moscow Bagration Bridge 2026-02-17 7292.jpg, author: Mike1979 Russia, licence: CC BY-SA 3.0 source, license

The sequence was therefore as follows: Tkhor proposed a business centre near Expocentre in 1991; Bagration Bridge opened in time for the city’s anniversary in 1997; and Tower 2000 was completed in 2001. The architectural catalogue entry groups the bridge and tower together, while a publication on the city’s history confirms the link between the banks. This is sufficient to identify the two structures as an early ensemble of Moscow City. Kommersant’s report links the delay in completing the high-rise to the withdrawal of funding and the subsequent purchase of the construction rights.

You can view the bridge and Tower 2000 from outside and see how they relate to the two banks during the ‘Poklon City’ tour: the bridge is listed among the sights on the bureau’s tour route. Given the announced closure of the crossing, this means viewing the ensemble rather than walking across it.

Sources

  1. Moscow Heritage. No. 3 (51), 2017. From the History of Moscow’s Embankments
  2. Archi.ru. Tower 2000 and Bagration Bridge
  3. Moskovskaya Perspektiva. First Above the Clouds, 26 February — 4 March 2019
  4. Moscow Transport Portal. Bagration Pedestrian Bridge to Close from 12 May 2025
  5. Kommersant. A Business Centre Years in the Making, 24 March 2005
  6. CITY PJSC. Moscow City Property Directory: Construction Dates for Tower 2000
  7. CITY PJSC. Tower 2000
  8. Architectural Bulletin. V. I. Travush at 85. From the anniversary exhibition at the Central House of Architects
  9. RBC Real Estate. Moscow City skyscrapers: the original vision for the district
  10. Radio Liberty. Delovoy Tsentr metro station opens in Moscow, 10 September 2005
  11. Moscow Bulletin. Moscow Government Resolution No. 1284-PP of 11 June 2024 on the renaming of stations
  12. Construction Gazette. The history and structure of Bagration Bridge
  13. SOK magazine: ‘The city of the future and its energy systems’, an overview of the construction of Moscow City (2002)
  14. Structural engineer Vladimir Travush’s interview with Maria Elkina about the construction of Moscow City
  15. Radius Tour Bureau. ‘Poklon City’ — a tour of Moscow City and Poklonnaya Hill

We took a tour of Taganka designed for 12-year-old children. It was an excellent programme. We covered a great deal of ground and learnt so much. We discovered the story of Dryanaya Street and discussed the Vladimir Highway, the surrounding monasteries and churches, and the Old Believers. We now know where Korovin was born, where Stanislavsky was born and raised, where the Morozov merchant children lived, and why Arseny Morozov was considered such an outrageous figure in his day. We also discussed Solzhenitsyn, discovered where Stalin Avenue was supposed to be built, saw the bunker, walked to the Russian metochion of the Mount Athos Monastery, and learnt why the Illuzion cinema made Taganka famous. Of course, no tour would have been complete without Vysotsky and Lyubimov. We also touched briefly on Taganka Prison, although naturally we did not go there. All in all, it was an exceptionally rich and informative tour! Our guide Alexander was superb!

Tatiana September 4, 2026

Our thanks to our guide Alexander for a magnificent sightseeing tour. Alexander’s love for Moscow and its history, his wide-ranging knowledge, elegant and engaging delivery, and personal charm make the tour not merely interesting and informative, but truly delightful! Thank you, Alexander! Tatiana and Tatiana, St Petersburg

Tatiana August 18, 2026

On July 18th, we participated in the "Soul of Moscow" group tour led by Alexander. Kitay-gorod and its surroundings revealed a new side to us, and everyone thoroughly enjoyed it. Some of us began intensively studying related materials to broaden our horizons. We'll be back, and we highly recommend it! You won't regret it.

Alexander July 20, 2026

Good afternoon, on June 23rd we had a tour called " The Soul of Moscow ," led by Alexander. He's a very pleasant young man. We visited such lovely courtyards and alleys with him that we never even knew existed, and we learned so much. We really enjoyed everything, and we hope to continue our acquaintance. Alexander! Thank you! We had a great time with you, and we thoroughly enjoyed it. See you there!

Tatyana, Galina, Nadezhda June 24, 2026

This isn't my first time with Radius. This time, I took the Moscow metro . The goal was not only to admire the underground palaces but also to learn how to navigate the metro. As a resident of a region without a metro, I was a bit apprehensive and didn't understand how to navigate the metro. Of course, the internet helps, but live communication is much better. Tour guide Yulia handled this task perfectly. The information was accessible and interesting, the presentation was calm, and the communication style was very friendly. Thank you very much for the tour and the practical experience.

Julia June 20, 2026

Good afternoon! I gave the "Soul of Moscow" tour to some of the capital's guests. We were thrilled to hear our guide, Anton. It was so informative and engaging, and very warm. To say we were absolutely delighted is an understatement. It turned out to be a truly family-friendly excursion. We learned so many interesting facts. The material was presented professionally, all our questions were answered, and we saw so much. It was simply WOW! Thank you so much, Anton, he's the best!!!!! From now on, I'll only come to you, the Radius team. I highly recommend it. I promise we'll see each other again soon on other tours.

Inna May 26, 2026

Overall, the tour left a positive impression! Thanks to Alexander for the walk through the courtyards and atmospheric spots of Kitay-Gorod; we certainly wouldn't have done it on our own. The tour was comfortable, and the guide spoke confidently and calmly. One thing we personally missed: we would have liked more of the historical part, relating to ancient Moscow and the history of Kitay-Gorod. There were quite a few stories about the Soviet period and the bar scene, but for our group, this wasn't particularly relevant. We think the program could be a little more tailored to the age and interests of the group. It would also have been interesting to add more historical facts, monuments, and details about old Moscow and the area itself. That said, the tour was still interesting, and some places and churches were truly memorable. These aren't really "cons," but rather suggestions for an even more comprehensive program.

Ksenia May 25, 2026

Hello! We had a corporate group of 10 people. Our guide was Anton, and we had a tour of Bulgakov. I would like to point out the excellent organization; everything went smoothly. The managers were very accommodating to our changes in the number of participants. The bus was very comfortable. Anton is a super-engaged and motivated guide. He lives this history and is delighted to share his knowledge and create an unforgettable experience. Everything went well. I highly recommend it!

Oleg February 19, 2026

Thank you for a fascinating tour! It gave me so much food for thought to explore! Note: Review of the "Zamoskvorechye" tour with guide Maria.

Eugene December 7, 2025

I'd like to express my gratitude on behalf of our team! Thank you for keeping to our scheduled schedule despite our lack of organization. Our colleagues appreciated your preparation for the tour! It was informative. Note: Review of the "Modern Residential Complexes, Factory Past, and Avant-Garde" tour of the ZILART residential complex with guide Maria. Maria prepared and conducted a customized tour for employees of the Samolet Group of Companies development company.

Team of the Samolet Group December 7, 2025

Thank you! You have great talent. Good luck! ☺️ You're a wonderful guide! Thank you again! Note: This is a review of the corporate tour "The Heart of the Capital" with guide Maria.

Dmitriy December 7, 2025

Thank you for a wonderful day today!!)) Note: review of the excursion "The Soul of Moscow" with guide Maria

Natalia December 7, 2025

On behalf of the whole family, I want to thank you for a very informative and interesting tour! Note: This is a review of the "Palace Dungeons" tour with guide Maria.

Eugene December 7, 2025

Good afternoon! I'd like to express my gratitude and that of my guide for organizing the tour! We were very pleased. We'd like to do it again in October, but on a different route — ZIL. Note: This refers to the tour for Samolet Group developers, led by guide Maria.

Elya September 27, 2025

Thanks to Alexander for the bar tour of Baumanka ! It was fun, exciting, and we discovered so many new places! Awesome! May we reach new heights!

Kira August 9, 2025

Good afternoon! I was on a tour of Sukharevskaya Square — we went all the way to Tsvetnoy Boulevard. I didn't expect it to be so interesting! For those wondering whether to go — go for it! It truly became one of my most memorable summer memories!

Kirill August 4, 2025

Anastasia, good morning! Thank you and Masha for yesterday! The speakers are happy. The connection through the headphones was often lost, especially at the checkpoint, but that's just our current situation. You could hear if you were standing close, no more than 1.5 meters away. Colleagues have already asked for your contact information. I'd be happy to share it and look forward to another opportunity to work with you. Special thanks to the Director for the Bureau . Note: " Heart of the Capital " tour for participants of the 2025 Moscow Oncology Forum. Guides: Anastasia and Maria.

Tina July 8, 2025

We'd like to thank Anton and Alexander for leading the tour! It was fascinating to hear how the Krasnaya Presnya district developed and how Prokhorov's influence on our city's development. It was a pleasant immersion into a quiet, previously unexplored area!

Dmitriy July 8, 2025

Good afternoon, thank you so much, Anastasia. The " Uncle Gilyai " tour was fantastic. Even though we're Muscovites and know a lot about Moscow, the experience was amazing, so much new and interesting happened. We'll definitely be back.

Victoria July 8, 2025

Thank you for the " Heart of Moscow " and " Khamovniki " tours. Anton, a knowledgeable and passionate Moscow guide, gave me the tour. He's a great storyteller, intelligent, well-read, and captivating. You've truly opened up my Moscow to me! I'll definitely be back next summer to explore Moscow with you. I'll recommend your wonderful tour program to all my friends!

Julia July 1, 2025

Excursions with the Radius travel agency are always a positive experience if you choose them. We planned a tour of Zamoskvorechye on our next visit. We've worked with our guide, Anton, before. We'll definitely recommend him to everyone we know. The tour is informative, not overloaded with dates, and the information is comprehensive yet easy to understand, as it's presented in a light, narrative manner, not like a history textbook, dry and academic. Thank you for this approach. We'll definitely use the Radius agency again on our next visit to Moscow.

Tatiana June 23, 2025

Thank you so much for the tour of Zamoskvorechye . Despite the weather, it was very interesting and informative! Note: this refers to the tour with guide Anton.

Tatiana May 6, 2025

A huge thank you to Anastasia. We had a fantastic tour of the Patriki district. We learned so much. Anastasia is a true master of her craft. The tour was captivating, not at all boring, lively and interesting. Everyone was delighted. We were full of new impressions. I definitely recommend it. You won't be disappointed!

Anna May 6, 2025

We explored the Soul of Moscow with my family and Radius on my birthday. Everyone thoroughly enjoyed the walk! Anton shared so many interesting facts about the capital and its history, taking us into spiritual depths no one else had even suspected. Most of us were either born or longtime Moscow residents who spent a lot of time walking around. It was educational, heartwarming, and unforgettable. 🙂 Overall, this wasn't my first time walking around Moscow with Anton, and each time was a real adventure!

Olga May 4, 2025